Is the installation complicated? Are any tools required?
Installation is straightforward and designed for non-professional users. Two mounting methods available:
No-Drill Installation (Self-Adhesive Mounting):
For lightweight tabletops (MDF, plywood under 15kg). Peel-and-stick adhesive pads on the base top plate. No tools required. Setup time: under 1 minute per base. Not recommended for heavy stone or glass tops.
Screw-Fixing Installation:
For all tabletop types including heavy stone. Pre-drilled mounting holes on the base top plate with included screw set. Requires a power drill or screwdriver only. Full hardware kit and printed instruction sheet included in every carton. Setup time: 1–2 minutes per base.
What's Included in Every Order:
•Complete screw and bolt set matched to your tabletop material
•Printed step-by-step installation guide
•Adjustable leveling feet (pre-installed on the base)
•Rubber gasket pads for stone/glass tabletop protection
Installation Steps (Screw Method):
1.Position base on tabletop underside, mark hole locations
2.Drill pilot holes (wood tops) or use provided anchors (MDF tops)
3.Secure base top plate with provided screws
4.Attach column to base plate
5.Adjust leveling feet for flat floor contact
For bulk installation projects, we provide video guides and bulk hardware packs


